Peregian Boardwalk comprises a mixed use development with Residential Apartments constructed over Commercial occupancies. The entire footprint of the site is occupied by a basement carpark with a podium level slab built over to support the above ground construction.
Challenges for the project included retention of the ground and structures neighbouring the site and accommodating thefall across the site within the podium slabs construction. We provided detailed construction documentation for the podium which nominated surface and soffit levels at all grade change points. This was vital for the builder in constructing his formwork and ultimately the podium.
