Matlow Place in Coolum consists of a multi-level commercial development which has 2 levels of basement carparking. The basement is submerged some 4m below the water table.
We provided our client with structural documentation for a water tight basement together with detailed documentation for the maangement of the site throughout the construction process.
The pictures below show the de-watered basement ready for foundation works ready to commence



